Nissan Altima 2007-2012 Service Manual: On-vehicle repair

BATTERY

Removal and Installation

REMOVAL

1. Remove air duct (front). Refer to EM-25, "Removal and Installation" QR25DE models, EM-129, "Removal and Installation" VQ35DE models.

2. Loosen battery terminal nuts, and disconnect both battery terminals.

CAUTION: When disconnecting, disconnect the negative terminal first.

3. Remove battery frame nuts and battery frame.

4. Remove battery.

INSTALLATION

Installation is in the reverse order of removal.

CAUTION: When connecting, connect the positive terminal first.

Reset electronic systems as necessary. Refer to PG-6, "ADDITIONAL SERVICE WHEN REMOVING BATTERY NEGATIVE TERMINAL : Special Repair Requirement".

    Preparation
    Special Service Tool Commercial Service Tool ...

    Other materials:

    IPDM-E branch line circuit
    Diagnosis Procedure INSPECTION PROCEDURE 1.CHECK CONNECTOR 1. Turn the ignition switch OFF. 2. Disconnect the battery cable from the negative terminal. 3. Check the terminals and connectors of the IPDM E/R for damage, bend and loose connection (unit side and connector side). Is the in ...

    High-pressure pipe
    Removal and Installation for High-Pressure Pipe QR25DE Removal 1. Discharge the refrigerant. Refer to HA-24, "HFC-134a (R-134a) Service Procedure". 2. Remove the strut tower bar. Refer to FSU-12, "Exploded View". 3. Remove the upper cowl. Refer to EXT-18, "Remova ...

    P1574 ASCD Vehicle speed sensor
    Description The ECM receives two vehicle speed signals via CAN communication line. One is sent from combination meter, and the other is from TCM (Transmission control module). The ECM uses these signals for ASCD control. Refer to EC-603, "System Description" for ASCD functions. D ...