Nissan Altima (L32) 2007-2012 Service Manual: On-vehicle repair
EVAP CANISTER
Exploded View
1. EVAP control system pressure sensor
2. EVAP canister
3. O-ring
4. EVAP canister vent control valve
5. O-ring
Removal and Installation
REMOVAL
1. Lift up the vehicle.
2. Remove EVAP canister fixing bolt.
3. Remove EVAP canister.
NOTE: The EVAP canister vent control valve and EVAP canister system pressure sensor can be removed without removing the EVAP canister.
INSTALLATION
Install in the reverse order of removal.
NOTE: Tighten EVAP canister fixing bolt to the specified torque.
DISASSEMBLY
1. Turn EVAP canister vent control valve counterclockwise.
A : Lock
B : Unlock
2. Remove the EVAP canister vent control valve.
ASSEMBLY
Assemble in the reverse order of disassembly.
CAUTION: Always replace O-ring with a new one.
Inspection
Check EVAP canister as per the following: 1. Block port (B).
2. Blow air into port (A) and check that it flows freely out of port (C).
3. Release blocked port (B).
4. Apply vacuum pressure to port (B) and check that vacuum pressure exists at the ports (A) and (C).
5. Block port (A) and (B).
6. Apply pressure to port (C) and check that there is no leakage.
Evap leak check
Inspection CAUTION: • Never use compressed air or a high pressure pump. • Never exceed 4.12 kPa (0.042 kg/cm2, 0.6 psi) of pressure in EVAP system. NOTE: • Do not start engine. • I ...Service data and specifications (SDS)
Idle Speed *: Under the following conditions • A/C switch: OFF • Electric load: OFF (Lights, heater fan & rear window defogger) • Steering wheel: Kept in straight-ahead position Ignit ...Other materials:
M&A branch line circuit
Diagnosis Procedure
INSPECTION PROCEDURE
1.CHECK CONNECTOR
1. Turn the ignition switch OFF.
2. Disconnect the battery cable from the negative terminal.
3. Check the terminals and connectors of the combination meter for damage, bend
and loose connection
(unit side and connector side).
...
M&A branch line circuit
Diagnosis Procedure
INSPECTION PROCEDURE
1.CHECK CONNECTOR
1. Turn the ignition switch OFF.
2. Disconnect the battery cable from the negative terminal.
3. Check the terminals and connectors of the combination meter for damage, bend
and loose connection
(unit side and connector side).
...
B2604 PNP switch
Description
BCM confirms the shift position with the following 4 signals.
• CVT selector lever
• P/N position switch
• P position signal from IPDM E/R (CAN)
• P position signal from TCM (CAN)
DTC Logic
DTC DETECTION LOGIC
NOTE:
• If DTC B2604 is displayed with DTC U1000, first ...