Nissan Altima 2007-2012 Service Manual: High-pressure pipe

Removal and Installation for High-Pressure Pipe

QR25DE

Removal

1. Discharge the refrigerant. Refer to HA-24, "HFC-134a (R-134a) Service Procedure".

2. Remove the strut tower bar. Refer to FSU-12, "Exploded View".

3. Remove the upper cowl. Refer to EXT-18, "Removal and Installation".

4. Remove the lower RH cowl.

5. Reposition the power steering reservoir out of the way without disconnecting the hose.

6. Reposition the engine coolant reservoir out of the way without disconnecting the hose.

7. Remove the high-pressure pipe. Refer to HA-31, "Component".

CAUTION: Cap or wrap the joint of the pipe with suitable material such as vinyl tape to avoid the entry of air.

Installation

Installation is in the reverse order of removal.

CAUTION: • Replace the O-ring of the high-pressure pipe with a new one, then apply compressor oil to it when installing it.

• After charging the refrigerant, check for leaks. Refer to HA-25, "Checking of Refrigerant Leaks".

VQ35DE

Removal

1. Discharge the refrigerant. Refer to HA-24, "HFC-134a (R-134a) Service Procedure".

2. Remove the strut tower bar. Refer to FSU-12, "Exploded View".

3. Remove the upper cowl. Refer to EXT-18, "Removal and Installation".

4. Remove the lower RH cowl.

5. Disconnect the power steering hose clamp to reposition the power steering hose out of the way.

6. Reposition the power steering reservoir out of the way without disconnecting the hose.

7. Reposition the engine coolant reservoir out of the way without disconnecting the hose.

8. Remove the high-pressure pipe. Refer to HA-31, "Component".

CAUTION: Cap or wrap the joint of the pipe with suitable material such as vinyl tape to avoid the entry of air.

Installation

Installation is in the reverse order of removal.

CAUTION: • Replace the O-ring of the high-pressure pipe with a new one, then apply compressor oil to it when installing it.

• After charging the refrigerant, check for leaks. Refer to HA-25, "Checking of Refrigerant Leaks".

Removal and Installation for Junction Pipe

REMOVAL

1. Discharge the refrigerant. Refer to HA-24, "HFC-134a (R-134a) Service Procedure".

2. Remove the front grille. Refer to EXT-17, "Removal and Installation".

3. Remove the junction pipe. Refer to HA-31, "Component".

CAUTION: Cap or wrap the joint of the pipe with suitable material such as vinyl tape to avoid the entry of air.

INSTALLATION

Installation is in the reverse order of removal.

CAUTION:

• Replace the O-ring of the junction pipe with a new one, then apply compressor oil to it when installing it.

• After charging the refrigerant, check for leaks. Refer to HA-25, "Checking of Refrigerant Leaks".

    High-pressure flexible hose
    Removal and Installation for High-Pressure Flexible Hose QR25DE Removal 1. Discharge the refrigerant. Refer to HA-32, "HFC-134a (R-134a) Service Procedure". 2. Reposition the power ...

    Condenser
    Removal and Installation for Condenser REMOVAL 1. Discharge the refrigerant. Refer to HA-32, "HFC-134a (R-134a) Service Procedure". 2. Remove the front fascia (coupe only). Refer to E ...

    Other materials:

    P0143 HO2S3
    Description The heated oxygen sensor 3, after HC adsorption catalyst (Under floor), monitors the oxygen level in the exhaust gas on each bank. This sensor is made of ceramic zirconia. The zirconia generates voltage from approximately 1V in richer conditions to 0V in leaner conditions. Unde ...

    Instrument panel
    1. Instrument brightness control/Trip computer reset switch 2. Vents 3. Headlight/fog light (if so equipped)/turn signal switch 4. Driver supplemental air bag/horn 5. Meters and gauges 6. Paddle shift controls (if so equipped) 7. Windshield wiper/washer switch 8. Hazard warning flasher ...

    Precaution
    Supplemental Restraint System (SRS) "AIR BAG" and "SEAT BELT PRE-TENSIONER" The Supplemental Restraint System such as “AIR BAG” and “SEAT BELT PRE-TENSIONER”, used along with a front seat belt, helps to reduce the risk or severity of injury to the driver and front ...