Nissan Altima 2007-2012 Service Manual: Additional service when removing battery negative terminal

 Description

Initial setting is necessary when battery terminal is diconnected.

CAUTION: The following specified operations are not performed under the non-initialized condition.

• Auto-up operation

• Anti-pinch function

• Retained power operation

 Special Repair Requirement

INITIALIZATION PROCEDURE

1. Disconnect battery negative terminal or main power window and door lock/unlock switch. Reconnect it after a minute or more.

2. Turn ignition switch ON.

3. Operate power window switch to fully open the window. (This operation is unnecessary if the window is already fully open) 4. Continue pulling the power window switch UP (AUTO-UP operation). Even after glass stops at fully closed position, keep pulling the switch for 4 seconds or more.

5. Inspect anti-pinch function.

CHECK ANTI-PINCH FUNCTION

1. Fully open the door window.

2. Place a piece of wood near fully closed position.

3. Close door glass completely with AUTO-UP.

• Check that glass lowers for approximately 150 mm or 2 seconds without pinching piece of wood and stops.

• Check that glass does not rise when operating the power window main switch while lowering.

CAUTION: • Do not check with hands and other part of body because they may be pinched. Do not get pinched.

• Check that AUTO-UP operates before inspection when system initialization is performed.

• It may switch to fail-safe mode if open/close operation is performed continuously. Perform initial setting in that situation. Refer to PWC-229, "Fail Safe".

• Perform initial setting when auto-up operation or anti-pinch function does not operate normally.

• Finish initial setting. Otherwise, next operation cannot be done.

1. Auto-up operation

2. Anti-pinch function

3. Retained power operation when ignition switch is OFF.

    Additional service when replacing control unit
     Description Initial setting is necessary when replacing main power window and door lock/unlock switch. CAUTION: The following specified operations are not performed under the non-initial ...

    Other materials:

    Can communication circuit
    Diagnosis Procedure INSPECTION PROCEDURE 1.CONNECTOR INSPECTION 1. Turn the ignition switch OFF. 2. Disconnect the battery cable from the negative terminal. 3. Disconnect all the unit connectors on CAN communication system. 4. Check terminals and connectors for damage, bend and loose con ...

    P0075 ivt control solenoid valve
    Description Intake valve timing control solenoid valve is activated by ON/OFF pulse duty (ratio) signals from the ECM. The intake valve timing control solenoid valve changes the oil amount and direction of flow through intake valve timing control unit or stops oil flow. The longer pulse w ...

    Engine coolant temperature gauge
    The gauge indicates the engine coolant temperature. The engine coolant temperature is within the normal range 1 when the gauge needle points within the zone shown in the illustration. The engine coolant temperature varies with the outside air temperature and driving conditions. CAUTION ...