Nissan Altima 2007-2012 Service Manual: B2603 shift position status

Description

BCM confirms the shift position with the following 2 signals.

• CVT selector lever

• P/N position switch

DTC Logic

DTC DETECTION LOGIC

NOTE: • If DTC B2603 is displayed with DTC U1000, first perform the trouble diagnosis for DTC U1000. Refer to SEC-235, "DTC Logic".

• If DTC B2603 is displayed with DTC U1010, first perform the trouble diagnosis for DTC U1010. Refer to SEC-236, "DTC Logic".

DTC CONFIRMATION PROCEDURE

1.PERFORM DTC CONFIRMATION PROCEDURE

1. Start the engine under the following conditions and wait for at least 1 second.

- CVT selector lever is in the P position.

- Do not depress the brake pedal.

2. Shift to N and wait for at least 1 second.

3. Shift to any gear other than P or N and wait for at least 1 second.

4. Check “Self diagnostic result” with CONSULT-III.

Is DTC detected? YES >> Refer to SEC-280, "Diagnosis Procedure".

NO >> Inspection End.

Diagnosis Procedure

1.CHECK DTC WITH IPDM E/R

Check “Self diagnostic result” with CONSULT-III. Refer to PCS-45, "DTC Index".

Is the inspection result normal? YES >> GO TO 2

NO >> Repair or replace malfunctioning parts.

2.CHECK PNP SWITCH CIRCUIT

1. Turn ignition switch OFF.

2. Disconnect TCM harness connector and BCM harness connector.

3. Check continuity between TCM harness connector F16 (A) terminal 20 and BCM harness connector M18 (B) terminal 48.

4. Check continuity between TCM harness connector F16 (A) terminal 20 and ground.

Is the inspection result normal? YES >> GO TO 3

NO >> Repair harness or connector.

3.CHECK CVT DEVICE POWER SUPPLY

1. Turn ignition switch OFF.

2. Disconnect CVT device (park position switch) harness connector.

3. Check voltage between CVT device (park position switch) harness connector and ground.

Is the inspection result normal? YES >> GO TO 5

NO >> GO TO 4

4.CHECK CVT DEVICE POWER SUPPLY CIRCUIT

1. Disconnect BCM harness connector.

2. Check continuity between BCM harness connector M19 (A) terminal 84 and CVT device (park position switch) harness connector M23 (B) terminal 8.

3. Check continuity between BCM harness connector M19 (A) terminal 84 and ground.

Is the inspection result normal? YES >> Replace BCM. Refer to BCS-96, "Removal and Installation".

NO >> Repair harness or connector.

5.CHECK CVT DEVICE CIRCUIT

1. Disconnect BCM harness connector.

2. Check continuity between BCM harness connector M19 (A) terminal 87 and CVT device (park position switch) harness connector M23 (B) terminal 9.

3. Check continuity between BCM harness connector M19 (A) terminal 87 and ground.

Is the inspection result normal? YES >> GO TO 6

NO >> Repair harness or connector.

6.CHECK CVT DEVICE

Refer to SEC-277, "Component Inspection".

Is the inspection result normal? YES >> GO TO 7

NO >> Replace CVT device. Refer to TM-255, "Removal and Installation" (RE0F09B) or TM-431, "Removal and Installation" (RE0F10A).

7.CHECK INTERMITTENT INCIDENT

Refer to GI-42, "Intermittent Incident".

>> Inspection End.

    B2602 shift position
    Description BCM confirms the shift position with the following 2 signals. • CVT selector lever • Speed signal from meter DTC Logic DTC DETECTION LOGIC NOTE: • If DTC B2602 is displayed ...

    B2604 PNP switch
    Description BCM confirms the shift position with the following 4 signals. • CVT selector lever • P/N position switch • P position signal from IPDM E/R (CAN) • P position signal from TC ...

    Other materials:

    P0710 CVT fluid temperature sensor
    Description The CVT fluid temperature sensor detects the CVT fluid temperature and sends a signal to the TCM. DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE CAUTION: Always drive vehicle at a safe speed. NOTE: If “DTC CONFIRMATION PROCEDURE” has been previously performed ...

    P0550 PSP Sensor
    Description Power steering pressure (PSP) sensor is installed to the power steering high-pressure tube and detects a power steering load. This sensor is a potentiometer which transforms the power steering load into output voltage, and emits the voltage signal to the ECM. The ECM controls t ...

    Disassembly and assembly
    DOOR MIRROR Exploded View 1. Door mirror cover 2. Mirror housing assembly 3. Mirror glass and holder Disassembly 1. Turn the mirror glass surface upward. 2. Apply a protective tape (A) to mirror housing. Insert a suitable tool (B) into the concave gap between the mirror holder (1) and ...