Nissan Altima 2007-2012 Service Manual: B2615 blower relay circuit

Description

BCM controls the various electrical components and simultaneously supplies power according to the power supply position.

BCM checks the power supply position internally.

DTC Logic

DTC DETECTION LOGIC

DTC CONFIRMATION PROCEDURE

1. PERFORM DTC CONFIRMATION PROCEDURE

1. Turn ignition switch ON under the following conditions, and wait for at least 1 second.

- CVT selector lever is in the P or N position.

- Release brake pedal.

2. Check “Self diagnostic result” with CONSULT-III.

Is DTC detected? YES >> Go to PCS-68, "Diagnosis Procedure".

NO >> Inspection End.

Diagnosis Procedure

1. CHECK BLOWER RELAY POWER SUPPLY

1. Turn ignition switch OFF.

2. Disconnect blower relay.

3. Check voltage between blower relay harness connector and ground under the following conditions.

Is the inspection result normal? YES >> GO TO 3

NO >> GO TO 2

2. CHECK BLOWER RELAY POWER SUPPLY CIRCUIT

1. Turn ignition switch OFF.

2. Disconnect BCM harness connector.

3. Check continuity between blower relay harness connector (A) and BCM harness connector (B).

4. Check continuity between blower relay harness connector (A) and ground.

Is the inspection result normal? YES >> GO TO 6

NO >> Repair or replace harness.

3. CHECK BLOWER RELAY GROUND CIRCUIT

1. Turn ignition switch OFF.

2. Check continuity between blower relay harness connector and ground.

Is the inspection result normal? YES >> GO TO 4

NO >> Repair blower relay ground circuit.

4.CHECK BLOWER RELAY POWER SUPPLY CIRCUIT-2

Check voltage between blower relay harness connector and ground.

Is the inspection result normal? YES >> GO TO 5

NO >> Repair or replace harness.

5. CHECK BLOWER RELAY

Refer to PCS-70, "Component Inspection (Blower Relay)".

Is the inspection result normal? YES >> GO TO 6

NO >> Replace blower relay.

6. CHECK INTERMITTENT INCIDENT

Refer to GI-42, "Intermittent Incident".

>> Inspection End.

Component Inspection (Blower Relay)

1. CHECK BLOWER RELAY

1. Turn ignition switch OFF.

2. Remove blower relay.

3. Check the continuity between blower relay terminals under the following conditions.

Is the inspection result normal? YES >> Inspection End.

NO >> Replace blower relay.

    B2614 ACC relay circuit
    Description BCM controls the various electrical components and simultaneously supplies power according to the power supply position. BCM checks the power supply position internally. DTC Logic ...

    B2616 ignition relay circuit
    Description BCM controls the various electrical components and simultaneously supplies power according to the power supply position. BCM checks the power supply position internally. DTC Logic ...

    Other materials:

    Hydraulic line
    QR25DE : Exploded View CAUTION: Securely insert harness connector to pressure sensor. 1. Reservoir tank 2. Reservoir tank bracket 3. Suction hose 4. High-pressure hose 5. Oil pump assembly 6. Steering gear assembly 7. Low pressure piping 8. High pressure piping 9. O-ring 10. Eye-bolt ...

    Fuel tank
    Exploded View 1. Lock ring 2. Fuel level sensor, fuel filter, and fuel pump assembly 3. Seal ring 4. Fuel tank mounting straps 5. Fuel tank protector 6. Fuel tank 7. Fuel filler hose 8. Fuel filler hose 9. Grommet 10. Fuel filler cap Removal and Installation REMOVAL WARNING: Read ...

    BCM
    Diagnosis Procedure 1. CHECK FUSE AND FUSIBLE LINK Check if the following BCM fuse or fusible link are blown. Is the fuse or fusible link blown? YES >> Replace the blown fuse or fusible link after repairing the affected circuit. NO >> GO TO 2 2. CHECK POWER SUPPLY CIRCUIT 1. ...