Nissan Altima 2007-2012 Service Manual: P0550 PSP Sensor

Description

Power steering pressure (PSP) sensor is installed to the power steering high-pressure tube and detects a power steering load.

This sensor is a potentiometer which transforms the power steering load into output voltage, and emits the voltage signal to the ECM. The ECM controls the electric throttle control actuator and adjusts the throttle valve opening angle to increase the engine speed and adjusts the idle speed for the increased load.

DTC Logic

DTC DETECTION LOGIC

NOTE: If DTC P0550 is displayed with DTC P0643, first perform the trouble diagnosis for DTC P0643. Refer to EC-362, "DTC Logic".

DTC CONFIRMATION PROCEDURE


DTC CONFIRMATION PROCEDURE

1.PRECONDITIONING

If DTC Confirmation Procedure has been previously conducted, always turn ignition switch OFF and wait at least 10 seconds before conducting the next test.

>> GO TO 2.

2.PERFORM DTC CONFIRMATION PROCEDURE

1. Start engine and let it idle for at least 5 seconds.

2. Check 1st trip DTC.

Is 1st trip DTC detected? YES >> Go to EC-354, "Diagnosis Procedure".

NO >> INSPECTION END

Diagnosis Procedure

1.CHECK GROUND CONNECTION

1. Turn ignition switch OFF.

2. Check ground connection E9. Refer to Ground Inspection in GI-45, "Circuit Inspection".

Is the inspection result normal? YES >> GO TO 2.

NO >> Repair or replace ground connection.

2.CHECK PSP SENSOR POWER SUPPLY CIRCUIT

1. Disconnect power steering pressure (PSP) sensor harness connector.

2. Turn ignition switch ON.

3. Check the voltage between PSP sensor harness connector and ground.


Is the inspection result normal?


Is the inspection result normal? YES >> GO TO 3.

NO >> Repair open circuit or short to ground or short to power in harness or connectors.

3.CHECK PSP SENSOR GROUND CIRCUIT FOR OPEN AND SHORT

1. Turn ignition switch OFF.

2. Disconnect ECM harness connector.

3. Check the continuity between PSP sensor harness connector and ECM harness connector.

4. Also check harness for short to ground and short to power.


4. Also check harness for short to ground and short to power.

Is the inspection result normal? YES >> GO TO 4.

NO >> Repair open circuit or short to ground short to power in harness or connectors.

4.CHECK PSP SENSOR INPUT SIGNAL CIRCUIT FOR OPEN AND SHORT

1. Check the continuity between PSP sensor harness connector and ECM harness connector.

2. Also check harness for short to ground and short to power.


2. Also check harness for short to ground and short to power.

Is the inspection result normal? YES >> GO TO 5.

NO >> Repair open circuit or short to ground or short to power in harness or connectors.

5.CHECK PSP SENSOR

Refer to EC-355, "Component Inspection".

Is the inspection result normal? YES >> GO TO 6.

NO >> Replace PSP sensor.

6.CHECK INTERMITTENT INCIDENT

Refer to GI-42, "Intermittent Incident".

>> INSPECTION END

Component Inspection

1.CHECK POWER STEERING PRESSURE SENSOR

1. Turn ignition switch OFF.

2. Reconnect all harness connectors disconnected.

3. Start engine and let it idle.

4. Check the voltage between ECM harness connector and ground under the following conditions.


Is the inspection result normal?


Is the inspection result normal? YES >> INSPECTION END

NO >> Replace power steering pressure sensor.

    P0507 ISC System
    Description The ECM controls the engine idle speed to a specified level through the fine adjustment of the air, which is let into the intake manifold, by operating the electric throttle control a ...

    P0603 ECM Power supply
    Description Battery voltage is supplied to the ECM even when the ignition switch is turned OFF for the ECM memory function of the DTC memory, the air-fuel ratio feedback compensation value memory, ...

    Other materials:

    Bluetooth® settings
    To access and adjust the settings for the Bluetooth® Hands-Free Phone System: 1. Press the SETTING button. 2. Use the TUNE/SCROLL knob to select “Bluetooth” and then press the ENTER button: ● Bluetooth Select “On” or “Off” to turn the vehicle’s Bluetooth® system on or ...

    Operating range
    The Intelligent Key functions can only be used when the Intelligent Key is within the specified operating range from the request switch 1 . When the Intelligent Key battery is discharged or strong radio waves are present near the operating location, the Intelligent Key system’s operating ...

    Cruise control operations
    The cruise control allows driving at a speed between 25 - 89 MPH (40 - 144 km/h) without keeping your foot on the accelerator pedal. To turn on the cruise control, push the ON·OFF switch on. The CRUISE indicator light in the instrument panel will illuminate. To set cruising speed, accelerat ...