Nissan Altima 2007-2012 Service Manual: Power window lock switch

Description

Ground circuit of main power window and door lock/unlock switch shuts off if power window lock switch of main power window and door lock/unlock switch is operated. This inhibits all operation, except for the main switch. Component Function Check

1. CHECK POWER WINDOW LOCK SIGNAL

Exchanges for a normal main power window and door lock/unlock switch, and operation is checked.

Does power window lock operate? YES >> Replace main power window and door lock/unlock switch. Refer to PWC-186, "Removal and Installation". After that, refer to PWC-126, "Special Repair Requirement".

NO >> Check condition of harness and connector.

Special Repair Requirement

1. PERFORM INITIALIZATION PROCEDURE

Perform initialization procedure.

Refer to PWC-95, "ADDITIONAL SERVICE WHEN REMOVING BATTERY NEGATIVE TERMINAL : Special Repair Requirement".

Is the inspection result normal? YES >> Inspection end.

NO >> Check intermittenrt incident. Refer to GI-42, "Intermittent Incident".

    Door switch
    Description Detects door open/close condition and transmits the signal to BCM. Component Function Check 1. CHECK FRONT DOOR SWITCH INPUT SIGNAL Check (“DOOR SW-DR” and “DOOR SW-AS”) in ...

    Other materials:

    NISSAN Vehicle Immobilizer System keys
    You can only drive your vehicle using the master keys which are registered to the NISSAN Vehicle Immobilizer System components in your vehicle. The master key can be used for all the locks. Never leave these keys in the vehicle. Additional or replacement keys: If you still have a key, the ke ...

    Body side trim
    Exploded View 1. Front pillar finisher 2. Dash side lower finisher 3. Front kicking plate 4. Front sill cover 5. Center pillar lower finisher 6. Rear sill cover 7. Rear kicking plate 8. Rear body side welt 9. Rear pillar finisher 10. Screw cover 11. Center pillar upper finisher 12. Fro ...

    IPDM E/R (intelligent power distribution module engine room)
    Diagnosis Procedure 1. CHECK FUSES AND FUSIBLE LINK Check that the following IPDM E/R fuses or fusible link are not blown. Is the fuse blown? YES >> Replace the blown fuse or fusible link after repairing the affected circuit. NO >> GO TO 2 2. CHECK POWER SUPPLY CIRCUIT 1. Tu ...