Nissan Altima 2007-2012 Service Manual: Service data and specifications (SDS)

Generator

 Power supply, ground & circuit elements coupe


    On-vehicle repair
    GENERATOR Removal and Installation QR25DE 1.-2. Tightening order 3. Generator 4. B terminal nut 5. Generator bracket bolts 6. Generator bracket Removal 1. Disconnect the battery negative ...

    Other materials:

    Ignition coil
    Exploded View 1. Ignition coil 2. Spark plug 3. Rocker cover (RH) 4. Rocker cover (LH) Removal and Installation LH REMOVAL 1. Remove engine room cover. 2. Disconnect ignition coil connector. 3. Remove the ignition coil. CAUTION: Never shock ignition coil. INSTALLATION Installatio ...

    M&A branch line circuit
    Diagnosis Procedure INSPECTION PROCEDURE 1.CHECK CONNECTOR 1. Turn the ignition switch OFF. 2. Disconnect the battery cable from the negative terminal. 3. Check the terminals and connectors of the combination meter for damage, bend and loose connection (unit side and connector side). ...

    Variable voltage control system
    CAUTION ● Do not ground accessories directly to the battery terminal. Doing so will bypass the variable voltage control system and the vehicle battery may not charge completely. ● Use electrical accessories with the engine running to avoid discharging the vehicle battery. Your ...