Nissan Altima 2007-2012 Service Manual: TCM branch line circuit

Diagnosis Procedure

INSPECTION PROCEDURE

1.CHECK CONNECTOR

1. Turn the ignition switch OFF.

2. Disconnect the battery cable from the negative terminal.

3. Check the following terminals and connectors for damage, bend and loose connection (unit side and connector side).

- TCM

- Harness connector F1

- Harness connector E3

Is the inspection result normal? YES >> GO TO 2.

NO >> Repair the terminal and connector.

2.CHECK HARNESS FOR OPEN CIRCUIT

1. Disconnect the connector of TCM.

2. Check the resistance between the TCM harness connector terminals.

Is the measurement value within the specification? YES >> GO TO 3.

NO >> Repair the TCM branch line.

3.CHECK POWER SUPPLY AND GROUND CIRCUIT

Check the power supply and the ground circuit of the TCM. Refer to the following.

• QR25DE models: TM-380, "Wiring Diagram - CVT CONTROL SYSTEM - Coupe" or TM-389, "Wiring Diagram - CVT CONTROL SYSTEM - Sedan" • VQ35DE models: TM-202, "Wiring Diagram—CVT CONTROL SYSTEM—Coupe" or TM-211, "Wiring Diagram— CVT CONTROL SYSTEM—Sedan" Is the inspection result normal? YES (Present error)>>Replace the TCM. Refer to the following.

• QR25DE models: TM-430, "Exploded View" • VQ35DE models: TM-254, "Exploded View" YES (Past error)>>Error was detected in the TCM branch line.

NO >> Repair the power supply and the ground circuit.

    ABS branch line circuit
    Diagnosis Procedure INSPECTION PROCEDURE 1.CHECK CONNECTOR 1. Turn the ignition switch OFF. 2. Disconnect the battery cable from the negative terminal. 3. Check the terminals and connectors ...

    IPDM-E branch line circuit
    Diagnosis Procedure INSPECTION PROCEDURE 1.CHECK CONNECTOR 1. Turn the ignition switch OFF. 2. Disconnect the battery cable from the negative terminal. 3. Check the terminals and connectors o ...

    Other materials:

    On-vehicle repair
    POWER WINDOW MAIN SWITCH Removal and Installation REMOVAL 1. Remove the power window main switch finisher (2). Refer to INT-34, "Removal and Installation". 2. Power window main switch (1) is removed from power window main switch finisher (2) using a suitable tool (A). CAUTION: ...

    P0550 PSP Sensor
    Description Power steering pressure (PSP) sensor is installed to the power steering high-pressure tube and detects a power steering load. This sensor is a potentiometer which transforms the power steering load into output voltage, and emits the voltage signal to the ECM. The ECM controls ...

    Power consumption control system
    System Diagram System Description OUTLINE • IPDM E/R incorporates a power consumption control function that reduces the power consumption according to the vehicle status. • IPDM E/R changes its status (control mode) with the sleep wake up signal received from BCM via CAN communicat ...