Nissan Altima 2007-2012 Service Manual: ABS branch line circuit

Diagnosis Procedure

INSPECTION PROCEDURE

1.CHECK CONNECTOR

1. Turn the ignition switch OFF.

2. Disconnect the battery cable from the negative terminal.

3. Check the terminals and connectors of the ABS actuator and electric unit (control unit) for damage, bend and loose connection (unit side and connector side).

Is the inspection result normal? YES >> GO TO 2.

NO >> Repair the terminal and connector.

2.CHECK HARNESS FOR OPEN CIRCUIT

1. Disconnect the connector of ABS actuator and electric unit (control unit).

2. Check the resistance between the ABS actuator and electric unit (control unit) harness connector terminals.

Is the measurement value within the specification? YES >> GO TO 3.

NO >> Repair the ABS actuator and electric unit (control unit) branch line.

3.CHECK POWER SUPPLY AND GROUND CIRCUIT

Check the power supply and the ground circuit of the ABS actuator and electric unit (control unit). Refer to the following.

• Models with ABS: BRC-41, "Wiring Diagram - Coupe" or BRC-46, "Wiring Diagram - Sedan" • Models with TCS: BRC-109, "Wiring Diagram - Coupe" or BRC-115, "Wiring Diagram - Sedan" • Models with VDC: BRC-207, "Wiring Diagram - Coupe" or BRC-215, "Wiring Diagram - Sedan" Is the inspection result normal? YES (Present error)>>Replace the ABS actuator and electric unit (control unit). Refer to the following.

• Models with ABS: BRC-66, "Exploded View" • Models with TCS: BRC-137, "Exploded View" • Models with VDC: BRC-239, "Exploded View" YES (Past error)>>Error was detected in the ABS actuator and electric unit (control unit) branch line.

NO >> Repair the power supply and the ground circuit.

    M&A branch line circuit
    Diagnosis Procedure INSPECTION PROCEDURE 1.CHECK CONNECTOR 1. Turn the ignition switch OFF. 2. Disconnect the battery cable from the negative terminal. 3. Check the terminals and connectors ...

    TCM branch line circuit
    Diagnosis Procedure INSPECTION PROCEDURE 1.CHECK CONNECTOR 1. Turn the ignition switch OFF. 2. Disconnect the battery cable from the negative terminal. 3. Check the following terminals and co ...

    Other materials:

    Line pressure test
    Inspection and Judgment INSPECTION Line Pressure Test Port (A) Line Pressure Test Procedure 1. Inspect the amount of engine oil and replenish if necessary. 2. Drive the car for about 10 minutes to warm it up so that the CVT fluid reaches in the range of 50 to 80°C (122 to 176°F), then ...

    Idle air volume learning
     Description Idle Air Volume Learning is a function of ECM to learn the idle air volume that keeps engine idle speed within the specific range. It must be performed under the following conditions: • Each time the electric throttle control actuator or ECM is replaced. • Idle speed o ...

    M&A branch line circuit
    Diagnosis Procedure INSPECTION PROCEDURE 1.CHECK CONNECTOR 1. Turn the ignition switch OFF. 2. Disconnect the battery cable from the negative terminal. 3. Check the terminals and connectors of the combination meter for damage, bend and loose connection (unit side and connector side). ...