Nissan Altima 2007-2012 Service Manual: B2602 shift position

Description

BCM confirms the shift position with the following 2 signals.

• CVT selector lever

• Speed signal from meter

DTC Logic

DTC DETECTION LOGIC

NOTE: • If DTC B2602 is displayed with DTC U1000, first perform the trouble diagnosis for DTC U1000. Refer to SEC-433, "DTC Logic".

• If DTC B2602 is displayed with DTC U1010, first perform the trouble diagnosis for DTC U1010. Refer to SEC-434, "DTC Logic".

DTC CONFIRMATION PROCEDURE

1.PERFORM DTC CONFIRMATION PROCEDURE

1. Start the engine under the following conditions and wait for at least 10 seconds.

- CVT selector lever is in the P or N position

- Depress the brake pedal.

2. Drive the vehicle for at least 10 seconds at a speed greater than 4 km/h (2 MPH).

3. Check “Self diagnostic result” with CONSULT-III.

Is DTC detected? YES >> Refer to SEC-470, "Diagnosis Procedure".

NO >> Inspection End.

Diagnosis Procedure

1.CHECK DTC WITH “COMBINATION METER”

Check “Self diagnostic result” with CONSULT-III. Refer to MWI-95, "DTC Index".

Is the inspection result normal? YES >> GO TO 2

NO >> Repair or replace malfunctioning parts.

2.CHECK CVT DEVICE POWER SUPPLY

1. Turn ignition switch to ACC.

2. Disconnect CVT device (park position switch) harness connector.

3. Check voltage between CVT device (park position switch) harness connector and ground.

Is the inspection result normal? YES >> GO TO 4

NO >> GO TO 3

3.CHECK CVT DEVICE POWER SUPPLY CIRCUIT

1. Disconnect BCM harness connector.

2. Check continuity between BCM harness connector M19 (A) terminal 84 and CVT device (park position switch) harness connector M23 (B) terminal 8.

3. Check continuity between BCM harness connector M19 (A) terminal 84 and ground.

Is the inspection result normal? YES >> Replace BCM. Refer to BCS-96, "Removal and Installation".

NO >> Repair harness or connector.

4.CHECK CVT DEVICE CIRCUIT

1. Disconnect BCM harness connector.

2. Check continuity between CVT device (park position switch) harness connector and BCM harness connector.

3. Check continuity between CVT device (park position switch) harness connector and ground.

Is the inspection result normal? YES >> GO TO 5

NO >> Repair harness or connector.

5.CHECK CVT DEVICE

Refer to SEC-469, "Component Inspection".

Is the inspection result normal? YES >> GO TO 6

NO >> Replace CVT device. Refer to TM-431, "Removal and Installation".

6.CHECK INTERMITTENT INCIDENT

Refer to GI-42, "Intermittent Incident".

>> Inspection End.

    B2601 shift position
    Description BCM confirms the shift position with the following 2 signals. • CVT selector lever • P position signal from IPDM E/R (CAN) DTC Logic DTC DETECTION LOGIC NOTE: • If DTC B26 ...

    B2603 shift position status
    Description BCM confirms the shift position with the following 2 signals. • CVT selector lever • P/N position switch DTC Logic DTC DETECTION LOGIC NOTE: • If DTC B2603 is displayed with ...

    Other materials:

    Battery replacement
    CAUTION Be careful not to allow children to swallow the battery or removed parts. NISSAN INTELLIGENT KEY® Replace the battery in the Intelligent Key as follows: 1. Remove the mechanical key from the Intelligent Key. 2. Insert a small screwdriver A into the slit B of the corner and twist it ...

    ABS branch line circuit
    Diagnosis Procedure INSPECTION PROCEDURE 1.CHECK CONNECTOR 1. Turn the ignition switch OFF. 2. Disconnect the battery cable from the negative terminal. 3. Check the terminals and connectors of the ABS actuator and electric unit (control unit) for damage, bend and loose connection (unit ...

    Input shaft and gear
    Exploded View Refer to TM-28, "Exploded View". Disassembly 1. Before disassembling, measure end play for 3rd, 4th, 5th, and 6th input gears. End play standard value : Refer to TM-83, "End Play". 2. Remove oil channel. 3. Press out input shaft rear bearing using Tool an ...