Description

BCM confirms the shift position with the following 2 signals.

• CVT selector lever

• P/N position switch

DTC Logic

DTC DETECTION LOGIC

NOTE: • If DTC B2603 is displayed with DTC U1000, first perform the trouble diagnosis for DTC U1000. Refer to SEC-433, "DTC Logic".

• If DTC B2603 is displayed with DTC U1010, first perform the trouble diagnosis for DTC U1010. Refer to SEC-434, "DTC Logic".

DTC CONFIRMATION PROCEDURE

1.PERFORM DTC CONFIRMATION PROCEDURE

1. Start the engine under the following conditions and wait for at least 1 second.

- CVT selector lever is in the P position.

- Do not depress the brake pedal.

2. Shift to N and wait for at least 1 second.

3. Shift to any gear other than P or N and wait for at least 1 second.

4. Check “Self diagnostic result” with CONSULT-III.

Is DTC detected? YES >> Refer to SEC-472, "Diagnosis Procedure".

NO >> Inspection End.

Diagnosis Procedure

1.CHECK DTC WITH IPDM E/R

Check “Self diagnostic result” with CONSULT-III. Refer to PCS-45, "DTC Index".

Is the inspection result normal? YES >> GO TO 2

NO >> Repair or replace malfunctioning parts.

2.CHECK PNP SWITCH CIRCUIT

1. Turn ignition switch OFF.

2. Disconnect TCM harness connector and BCM harness connector.

3. Check continuity between TCM harness connector F16 (A) terminal 20 and BCM harness connector M18 (B) terminal 48.

4. Check continuity between TCM harness connector F16 (A) terminal 20 and ground.

Is the inspection result normal? YES >> GO TO 3

NO >> Repair harness or connector.

3.CHECK CVT DEVICE POWER SUPPLY

1. Turn ignition switch OFF.

2. Disconnect CVT device (park position switch) harness connector.

3. Check voltage between CVT device (park position switch) harness connector and ground.

Is the inspection result normal? YES >> GO TO 5

NO >> GO TO 4

4.CHECK CVT DEVICE POWER SUPPLY CIRCUIT

1. Disconnect BCM harness connector.

2. Check continuity between BCM harness connector M19 (A) terminal 84 and CVT device (park position switch) harness connector M23 (B) terminal 8.

3. Check continuity between BCM harness connector M19 (A) terminal 84 and ground.

Is the inspection result normal? YES >> Replace BCM. Refer to BCS-96, "Removal and Installation".

NO >> Repair harness or connector.

5.CHECK CVT DEVICE CIRCUIT

1. Disconnect BCM harness connector.

2. Check continuity between BCM harness connector M19 (A) terminal 87 and CVT device (park position switch) harness connector M23 (B) terminal 9.

3. Check continuity between BCM harness connector M19 (A) terminal 87 and ground.

Is the inspection result normal? YES >> GO TO 6

NO >> Repair harness or connector.

6.CHECK CVT DEVICE

Refer to SEC-469, "Component Inspection".

Is the inspection result normal? YES >> GO TO 7

NO >> Replace CVT device. Refer to TM-431, "Removal and Installation".

7.CHECK INTERMITTENT INCIDENT

Refer to GI-42, "Intermittent Incident".

>> Inspection End.

    B2602 shift position
    Description BCM confirms the shift position with the following 2 signals. • CVT selector lever • Speed signal from meter DTC Logic DTC DETECTION LOGIC NOTE: • If DTC B2602 is displaye ...

    B2604 PNP switch
    Description BCM confirms the shift position with the following 4 signals. • CVT selector lever • P/N position switch • P position signal from IPDM E/R (CAN) • P position signal from TCM ...

    Other materials:

    Front tweeter
    Removal and Installation REMOVAL 1. Remove the front pillar finisher. Refer to INT-15, "Removal and Installation" (coupe) and INT-36, "Removal and Installation" (sedan). 2. Remove tweeter speaker grille. Refer to IP-12, "Removal and Installation". 3. Remove t ...

    Power steering
    WARNING ● If the engine is not running or is turned off while driving, the power assist for the steering will not work. Steering will be harder to operate. ● When the power steering warning light illuminates with the engine running, there will be no power assist for the steering. ...

    Power supply and ground circuit
    Diagnosis Procedure 1.INSPECTION START Start engine. Is engine running? YES >> GO TO 8. NO >> GO TO 2. 2.CHECK ECM POWER SUPPLY CIRCUIT-I 1. Turn ignition switch OFF and then ON. 2. Check the voltage between ECM harness connector and ground. Is the inspection result ...