DIAGNOSIS AND REPAIR WORKFLOW

Work Flow

OVERALL SEQUENCE

DETAILED FLOW

NOTE: To ensure a complete and thorough diagnosis, the battery, starter and generator test segments must be done as a set from start to finish.

1.PRELIMINARY INSPECTION

Perform the preliminary inspection. Refer to CHG-7, "Inspection Procedure".

>> GO TO 2

2.DISABLE THE POWER GENERATION VOLTAGE VARIABLE CONTROL SYSTEM

Disable the power generation voltage variable control with either of the following procedures.

• After selecting “ENGINE” on the “SELECT SYSTEM” screen of CONSULT-III, set the “ALTERNATOR DUTY” value to 0 % by selecting “ALTERNATOR DUTY” with “Active Test”. Continue “Active Test” until the end of inspection. (When the DUTY value is 0 or 100 %, the normal power generation is performed according to the characteristic of the IC regulator of the generator.) • Turn the ignition switch OFF, disconnect the battery current sensor connector and leave it disconnected during the course of the test.

NOTE: Running the engine with the battery current sensor disconnected will cause DTC's (P1550-P1554) to set.

After finishing the inspection, connect the battery current sensor connector and erase the self-diagnostic results history of the engine using CONSULT-III.

>> GO TO 3

3.DIAGNOSIS WITH STARTING/CHARGING SYSTEM TESTER

Perform the charging system test using Starting/Charging System Tester (J-44373). For details and operating instructions, refer to Technical Service Bulletin.

Test result

CHARGING SYSTEM NOMAL>>Charging system is normal and will also show “DIODE RIPPLE” test result.

NO CHARGING VOLTAGE>>GO TO 4

LOW CHARGING VOLTAGE>>GO TO 12

HIGH CHARGING VOLTAGE>>GO TO 14

HIGH CHARGING VOLTAGE>>GO TO 14 DIODE RIPPLE NORMAL>>Diode ripple is OK and will also show “CHARGING VOLTAGE” test result.

EXCESS RIPPLE DETECTED>>Replace the generator. Perform “DIODE RIPPLE” test again using Starting/ Charging System Tester (J-44373) to confirm repair.

DIODE RIPPLE NOT DETECTED>>GO TO 4

4.INSPECTION WITH CHARGE WARNING LAMP (IGNITION SWITCH IS ON)

Turn the ignition switch ON.

Does the charge warning lamp illuminate? YES >> GO TO 6

NO >> GO TO 5

5.TERMINAL“2” (OPEN) CIRCUIT INSPECTION

Check terminal “2” circuit for open circuits. Refer to CHG-11, "Diagnosis Procedure".

Is the terminal “2” circuit normal? YES >> Replace generator. Refer to CHG-27, "Removal and Installation".

NO >> Repair as needed.

6.INSPECTION WITH CHARGE WARNING LAMP (IDLING)

Start the engine and run it at idle.

Does the charge warning lamp turn OFF? YES >> GO TO 9

NO >> GO TO 7

7.TERMINAL “2”(SHORT) CIRCUIT INSPECTION

Check terminal “2” circuit for short to ground. Refer to CHG-11, "Diagnosis Procedure".

Is the terminal “2” circuit normal?

YES >> GO TO 8

NO >> Repair as needed.

8.TERMINAL“3” CIRCUIT INSPECTION

Check terminal “3” circuit. Refer to CHG-12, "Diagnosis Procedure".

Is the terminal “3” circuit normal? YES >> GO TO 10

NO >> Repair as needed.

9.INSPECTION WITH CHARGE WARNING LAMP (ENGINE AT 3,000 RPM)

Increase and maintain the engine speed at 3,000 rpm.

Does the charge warning lamp remain off? YES >> GO TO 11

NO >> GO TO 10

10.INSPECTION OF GENERATOR PULLEY

Check generator pulley. Refer to CHG-29, "Inspection".

Is generator pulley normal? YES >> Replace generator. Refer to CHG-27, "Removal and Installation".

NO >> Repair as needed.

11.TERMINAL “1” CIRCUIT INSPECTION

Check terminal “1””circuit. Refer to CHG-10, "Diagnosis Procedure".

Is terminal “1” circuit normal? YES >> Replace generator. Refer to CHG-27, "Removal and Installation".

NO >> Repair as needed.

12.TERMINAL “1” CIRCUIT INSPECTION

Check terminal “1” circuit. Refer to CHG-10, "Diagnosis Procedure".

Is terminal “1” circuit normal? YES >> GO TO 13

NO >> Repair as needed.

13.INSPECTION OF GENERATOR PULLEY

Check generator pulley. Refer to CHG-29, "Inspection".

Is generator pulley normal? YES >> Replace generator. Refer to CHG-27, "Removal and Installation".

NO >> Repair as needed.

14.TERMINAL “3” CIRCUIT INSPECTION

Check terminal “3” circuit. Refer to CHG-12, "Diagnosis Procedure".

Is the terminal “3” circuit normal? YES >> Replace generator. Refer to CHG-27, "Removal and Installation".

NO >> Repair as needed.

    Other materials:

    P2004 tumble control valve
    Description Tumble control valve (3) is installed in the intake manifold adapter (1). Tumble control valve actuator (2) is connected to the front end of the valve shaft. Tumble control valve actuator consists of motor and position sensor, etc. The motor opens or closes the valve by the ...

    Idle speed
    Description This describes how to check the idle speed. For the actual procedure, follow the instructions in “BASIC INSPECTION”. Special Repair Requirement 1.CHECK IDLE SPEED Check idle speed in “DATA MONITOR” mode with CONSULT-III. Check idle speed with Service $01 of GST. > ...

    Battery
    If the battery is labeled "do not open" it is maintenance free and battery fluid should not be checked. It is recommended that you visit a NISSAN dealer or a qualified specialist workshop to confirm the battery’s performance. Keep the battery surface clean and dry. Clean the battery with ...