Nissan Altima 2007-2012 Service Manual: Driver side

 Description

Door glass moves UP/DOWN by receiving the signal from main power window and door lock/unlock switch.

Component Function Check

1. CHECK POWER WINDOW MOTOR LH CIRCUIT

Does power window motor LH operate with the main power window and door lock/unlock switch? Is the inspection result normal? YES >> Power window motor LH is OK.

NO >> Refer to PWC-25, "DRIVER SIDE : Diagnosis Procedure".

Diagnosis Procedure

Power Window Motor LH Circuit Check

1. CHECK MAIN POWER WINDOW AND DOOR LOCK/UNLOCK SWITCH OUTPUT SIGNAL

1. Disconnect power window motor LH.

2. Turn ignition switch ON.

3. Check voltage between power window motor LH connector and ground.

Is the measurement value within the specification? YES >> GO TO 2

NO >> Replace main power window and door lock/unlock switch. Refer to PWC-91, "Removal and Installation".

After that, refer to PWC-12, "ADDITIONAL SERVICE WHEN REPLACING CONTROL UNIT : Special Repair Requirement".

2. CHECK HARNESS CONTINUITY

1. Turn ignition switch OFF.

2. Disconnect main power window and door lock/unlock switch.

3. Check continuity between main power window and door lock/ unlock switch connector (A) and power window motor LH connector (B).

4. Check continuity between main power window and door lock/unlock switch connector (A) and ground.

Is the inspection result normal? YES >> GO TO 3

NO >> Repair or replace harness.

3. CHECK POWER WINDOW MOTOR LH

Check power window motor LH.

Refer to PWC-203, "DRIVER SIDE : Component Inspection".

Is the inspection result normal? YES >> Check intermittent incident. Refer to GI-42, "Intermittent Incident".

NO >> Replace power window motor LH. Refer to GW-19, "Removal and Installation". After that, refer to PWC-12, "ADDITIONAL SERVICE WHEN REPLACING CONTROL UNIT : Special Repair Requirement".

Component Inspection

COMPONENT INSPECTION

1. CHECK POWER WINDOW MOTOR LH

Does motor operate by connecting the battery voltage directly to power window motor?

Is the inspection result normal? YES >> Power window motor LH is OK.

NO >> Replace power window motor LH. Refer to GW-19, "Removal and Installation". After that, refer to PWC-12, "ADDITIONAL SERVICE WHEN REPLACING CONTROL UNIT : Special Repair Requirement".

 Special Repair Requirement

1. PERFORM INITIALIZATION PROCEDURE

Perform initialization procedure.

Refer to PWC-12, "ADDITIONAL SERVICE WHEN REPLACING CONTROL UNIT : Special Repair Requirement".

Is the inspection result normal? YES >> GO TO 2

NO >> Check intermittent incident. Refer to GI-42, "Intermittent Incident".

2. CHECK ANTI-PINCH OPERATION

Check anti-pinch operation.

Refer to PWC-12, "ADDITIONAL SERVICE WHEN REPLACING CONTROL UNIT : Special Repair Requirement".

Is the inspection result normal? YES >> Inspection End.

NO >> Refer to PWC-29, "DRIVER SIDE : Component Function Check".

    Passenger side
     Description Door glass moves UP/DOWN by receiving the signal from main power window and door lock/unlock switch or power window and door lock/unlock switch RH. Component Function Check 1. ...

    Other materials:

    Symptom diagnosis
    SQUEAK AND RATTLE TROUBLE DIAGNOSES Work Flow CUSTOMER INTERVIEW Interview the customer if possible, to determine the conditions that exist when the noise occurs. Use the Diagnostic Worksheet during the interview to document the facts and conditions when the noise occurs and any customer' ...

    Ecu diagnosis
    ECM Reference Value VALUES ON THE DIAGNOSIS TOOL Remarks: ● Specification data are reference values. ● Specification data are output/input values which are detected or supplied by the ECM at the connector. ● Specification data may not be directly related to their com ...

    Symptom diagnosis
    SQUEAK AND RATTLE TROUBLE DIAGNOSES Work Flow CUSTOMER INTERVIEW Interview the customer if possible, to determine the conditions that exist when the noise occurs. Use the Diagnostic Worksheet during the interview to document the facts and conditions when the noise occurs and any customer' ...