Nissan Altima 2007-2012 Service Manual: ABS branch line circuit

Diagnosis Procedure

INSPECTION PROCEDURE

1.CHECK CONNECTOR

1. Turn the ignition switch OFF.

2. Disconnect the battery cable from the negative terminal.

3. Check the terminals and connectors of the ABS actuator and electric unit (control unit) for damage, bend and loose connection (unit side and connector side).

Is the inspection result normal? YES >> GO TO 2.

NO >> Repair the terminal and connector.

2.CHECK HARNESS FOR OPEN CIRCUIT

1. Disconnect the connector of ABS actuator and electric unit (control unit).

2. Check the resistance between the ABS actuator and electric unit (control unit) harness connector terminals.

Is the measurement value within the specification? YES >> GO TO 3.

NO >> Repair the ABS actuator and electric unit (control unit) branch line.

3.CHECK POWER SUPPLY AND GROUND CIRCUIT

Check the power supply and the ground circuit of the ABS actuator and electric unit (control unit). Refer to the following.

• Models with ABS: BRC-41, "Wiring Diagram - Coupe" or BRC-46, "Wiring Diagram - Sedan" • Models with TCS: BRC-109, "Wiring Diagram - Coupe" or BRC-115, "Wiring Diagram - Sedan" • Models with VDC: BRC-207, "Wiring Diagram - Coupe" or BRC-215, "Wiring Diagram - Sedan" Is the inspection result normal? YES (Present error)>>Replace the ABS actuator and electric unit (control unit). Refer to the following.

• Models with ABS: BRC-66, "Exploded View" • Models with TCS: BRC-137, "Exploded View" • Models with VDC: BRC-239, "Exploded View" YES (Past error)>>Error was detected in the ABS actuator and electric unit (control unit) branch line.

NO >> Repair the power supply and the ground circuit.

    STRG branch line circuit
    Diagnosis Procedure INSPECTION PROCEDURE 1.CHECK CONNECTOR 1. Turn the ignition switch OFF. 2. Disconnect the battery cable from the negative terminal. 3. Check the terminals and connectors o ...

    TCM branch line circuit
    Diagnosis Procedure INSPECTION PROCEDURE 1.CHECK CONNECTOR 1. Turn the ignition switch OFF. 2. Disconnect the battery cable from the negative terminal. 3. Check the following terminals and co ...

    Other materials:

    Cooling fan control
    System Diagram System Description INPUT/OUTPUT SIGNAL CHART *1: The ECM determines the start signal status by the signals of engine speed and battery voltage. *2: This signal is sent to ECM through CAN communication line. SYSTEM DESCRIPTION ECM controls cooling fan speed correspondin ...

    Off-road recovery
    If the right side or left side wheels unintentionally leave the road surface, maintain control of the vehicle by following the procedure below. Please note that this procedure is only a general guide. The vehicle must be driven as appropriate based on the conditions of the vehicle, road and t ...

    P0643 Sensor power supply
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PRECONDITIONING If DTC Confirmation Procedure has been previously conducted, always perform the following before conducting the next test. 1. Turn ignition switch OFF and wait at least 10 seconds. 2. Turn ignition switch ON. ...