Nissan Altima 2007-2012 Service Manual: TCM branch line circuit

Diagnosis Procedure

INSPECTION PROCEDURE

1.CHECK CONNECTOR

1. Turn the ignition switch OFF.

2. Disconnect the battery cable from the negative terminal.

3. Check the following terminals and connectors for damage, bend and loose connection (unit side and connector side).

- TCM

- Harness connector F1

- Harness connector E3

Is the inspection result normal? YES >> GO TO 2.

NO >> Repair the terminal and connector.

2.CHECK HARNESS FOR OPEN CIRCUIT

1. Disconnect the connector of TCM.

2. Check the resistance between the TCM harness connector terminals.

Is the measurement value within the specification?


Is the measurement value within the specification? YES >> GO TO 3.

NO >> Repair the TCM branch line.

3.CHECK POWER SUPPLY AND GROUND CIRCUIT

Check the power supply and the ground circuit of the TCM. Refer to the following.

• QR25DE models: TM-380, "Wiring Diagram - CVT CONTROL SYSTEM - Coupe" or TM-389, "Wiring Diagram - CVT CONTROL SYSTEM - Sedan" • VQ35DE models: TM-202, "Wiring Diagram—CVT CONTROL SYSTEM—Coupe" or TM-211, "Wiring Diagram— CVT CONTROL SYSTEM—Sedan" Is the inspection result normal? YES (Present error)>>Replace the TCM. Refer to the following.

• QR25DE models: TM-430, "Exploded View" • VQ35DE models: TM-254, "Exploded View" YES (Past error)>>Error was detected in the TCM branch line.

NO >> Repair the power supply and the ground circuit.

    ABS branch line circuit
    Diagnosis Procedure INSPECTION PROCEDURE 1.CHECK CONNECTOR 1. Turn the ignition switch OFF. 2. Disconnect the battery cable from the negative terminal. 3. Check the terminals and connectors ...

    IPDM-E branch line circuit
    Diagnosis Procedure INSPECTION PROCEDURE 1.CHECK CONNECTOR 1. Turn the ignition switch OFF. 2. Disconnect the battery cable from the negative terminal. 3. Check the terminals and connectors o ...

    Other materials:

    Oil pressure switch signal circuit
    Description Detects the engine oil pressure and transmits the oil pressure switch signal to the IPDM E/R. Component Function Check 1.COMBINATION METER INPUT SIGNAL 1. Select “METER/M&A” on CONSULT-III. 2. Monitor “OIL W/L” of “DATA MONITOR” while operatin ...

    Main line between DLC and ABS circuit
    Diagnosis Procedure INSPECTION PROCEDURE 1.CHECK CONNECTOR 1. Turn the ignition switch OFF. 2. Disconnect the battery cable from the negative terminal. 3. Check the following terminals and connectors for damage, bend and loose connection (connector side and harness side). - Harness co ...

    Anti-pinch system does not operate normally (driver side)
    Diagnosis Procedure 1. PERFORM INITIALIZATION PROCEDURE Perform initialization procedure. Refer to PWC-21, "POWER WINDOW MAIN SWITCH : Special Repair Requirement". Is the inspection result normal? YES >> GO TO 2 NO >> Repair or replace the malfunctioning parts. 2. C ...