Nissan Altima Owners Manual: Extending engine run time

The remote start feature can be extended one time by performing the steps listed in “Remote starting the vehicle” in this section. Run time will be calculated as follows: ● The first 10 minute run time will start when the remote start function is performed.

● The second 10 minutes will start immediately when the remote start function is performed.

For example, if the engine has been running for 5 minutes, and 10 minutes are added, the engine will run for a total of 15 minutes.

A maximum of two remote starts, or a single start with an extension, are allowed between ignition cycles.

The ignition switch must be cycled to the ON position and then back to the OFF position before the remote start procedure can be used again.

    Remote starting the vehicle
    perform the following: 1. Aim the Intelligent Key at the vehicle. 2. Press the LOCK button to lock all doors. 3. Within 5 seconds press and hold the remote start button until the turn si ...

    Canceling a remote start
    To cancel a remote start, perform one of the following: ● Aim the Intelligent Key at the vehicle and press and hold until the parking lights turn off. ● Turn on the hazard warning ...

    Other materials:

    DLC Branch line circuit
    Diagnosis Procedure INSPECTION PROCEDURE 1.CHECK CONNECTOR 1. Turn the ignition switch OFF. 2. Disconnect the battery cable from the negative terminal. 3. Check the terminals and connectors of the data link connector for damage, bend and loose connection (connector side and harness side) ...

    On-vehicle maintenance
    ROAD WHEEL Inspection ALUMINUM WHEEL 1. Check tires for wear and improper inflation. 2. Check wheels for deformation, cracks and other damage. If deformed, remove wheel and check wheel runout. a. Remove tire from aluminum wheel and mount on a tire balance machine. b. Set dial indicat ...

    Basic inspection
    DIAGNOSIS AND REPAIR WORKFLOW Work Flow OVERALL SEQUENCE DETAILED FLOW NOTE: To ensure a complete and thorough diagnosis, the battery, starter and generator test segments must be done as a set from start to finish. 1.PRELIMINARY INSPECTION Perform the preliminary inspection. Refer to CH ...